Penn Valley Drive | Kansas City, MO

VSM Engineering designed a storm water system for improvements made to Penn Valley Drive and 29th Street in Penn Valley Park. The design was optimized to reuse as much of the existing system as possible, while solving drainage problems on the site. Nearly 1,500 feet of new storm pipe was designed, ranging in size from 15 inches to 36 inches. The improvements incorporated several green design solutions, including two water quality control features used in place of traditional storm inlets.